Modular home wall-panel line — 1 panel every 9 minutes
Building Products2025Pennsylvania, USA

Modular home wall-panel line — 1 panel every 9 minutes

Framing jig with auto-nailing gantry and a sheathing gantry for wood-framed wall panels.

Client
Confidential — Modular Home Builder
Location
Pennsylvania, USA
Capabilities
Turnkey Line Build · Robotics Integration
1 panel / 9 min
Per panel
3 crews → 1
Crew per house
OSB + 2x
Scope

The challenge

Modular home builder was scaling from 600 to 1,500 homes per year. Framing crews were the bottleneck and field-stick framing crews were unwilling to relocate to the new plant town.

What we built

Two-station framing line: jig fixtures the plates and studs, an overhead gantry drives a Senco PalletPro auto-nailer through the schedule, and a second gantry applies OSB sheathing with screw insertion. A vision check verifies stud spacing before sheathing.

Key equipment

  • Senco PalletPro auto-nailer
  • Custom gantry XY system
  • Cognex 2D vision
  • Pneumatic clamp jig

From the floor

Illustrative image — representative of project scope; customer-identifying details have been removed.

Modular home wall-panel line — 1 panel every 9 minutes — 1
Modular home wall-panel line — 1 panel every 9 minutes — 2
Modular home wall-panel line — 1 panel every 9 minutes — 3

Results

Output averages 1 panel every 9 minutes. The builder reduced framing manpower per house from 3 crews to 1, and the new plant ramped to 1,500 home/year without recruiting field framers.