Personal-care packaging line — 8 SKUs, sub-3-minute changeover
Greenfield secondary packaging with case erector, top-load packer, and hot-melt sealer designed around fast SKU changeover.
- Client
- Confidential — Personal Care Manufacturer
- Location
- North Carolina, USA
- Capabilities
- Turnkey Line Build · Machine Vision
The challenge
Existing line could run only 3 SKUs without 45-minute tooling swaps. Marketing was pushing 5 new SKUs and the planner could not fit them in the schedule without losing 12 hours per week to changeover.
What we built
Wexxar BEL 252 case erector and Brenton top-load packer with servo-driven adjustable rails. Recipe-driven changeover through the HMI swaps tooling presets in under 3 minutes. Cognex vision verifies case orientation before sealing.
Key equipment
- Wexxar BEL 252 case erector
- Brenton M2000 packer
- Nordson hot-melt glue system
- Cognex In-Sight 2800
From the floor
Illustrative image — representative of project scope; customer-identifying details have been removed.



Results
Eight SKUs running on the line within 90 days of startup; changeover time averages 2:40, and weekly OEE jumped 14 points vs. the predecessor.
See all 20 projects
Packaging•2025DTC fulfillment bagger line — 1,800 orders/hr at 99.7% accuracy
Pick-to-bag fulfillment cell with vision-verified SKU match, auto-bagger, and print-and-apply at sustained 1,800 oph.
1,800 ophOrders per hour-58%Labor vs baseline99.7%Order accuracy
Food & Beverage•2025Dairy bottling line retrofit — 18% throughput, 62% fewer rejects
Replaced a 1998-era controls stack with modern PLC + vision while keeping the existing filler and capper steel.
+18%Throughput-62%Reject rate11 wkProject lead time
Food & Beverage•2025Robotic palletizing cell — 2 shifts of manual stacking eliminated
Greenfield palletizing cell at end-of-line, sized for 60 cases per minute across 12 SKUs with quick-change tooling.
2Shifts of manual stacking replaced60 cpmCases per minute16 moProjected payback